bberilam
05-02-2006, 01:07 AM
A design advisment team has been hired from Ellerbe Becket
http://www.news-leader.com/apps/pbcs.dll/article?AID=/20060501/BREAKING02/60501010
The article points out that they haven't been signed to actually design the facility yet, but it sure looks like their going to be the ones.
"Greg Burris, committee chair, stressed that Becket has not been hired as the arena architect although it is unlikely the architectural and design work would go to another firm."
If they are the ones hired, that's really good for Missouri State, because this is a top rate design team. Check out some of their projects at the link below.
http://www.ellerbebecket.com/dynamic/portfolio_results.cfm?ptype=202&sort=date
Wow the Sprint Center is looks AMAZING.
Finally something for Bears fans to get excited about again.
:bears:
http://www.news-leader.com/apps/pbcs.dll/article?AID=/20060501/BREAKING02/60501010
The article points out that they haven't been signed to actually design the facility yet, but it sure looks like their going to be the ones.
"Greg Burris, committee chair, stressed that Becket has not been hired as the arena architect although it is unlikely the architectural and design work would go to another firm."
If they are the ones hired, that's really good for Missouri State, because this is a top rate design team. Check out some of their projects at the link below.
http://www.ellerbebecket.com/dynamic/portfolio_results.cfm?ptype=202&sort=date
Wow the Sprint Center is looks AMAZING.
Finally something for Bears fans to get excited about again.
:bears: